Profession: Civil Engineer
Education: Doctor of Philosophy: Civil Engineering. Project Management Essentials for Construction (University of Toronto)
Specialization: Project Management, Construction Coordination, Road & Airport Design and execution , QA/QC.
Position in Firm: Project Manager-Design, Contract Administrator, Road & Airport Design Engineer, Project Civil Engineer , Infrastructure Engineer, Resident Engineer, Civil Senior Inspector, Project Manager-Construction, Construction Manager, Project coordinator
Showing posts with label Earth Work. Show all posts
Showing posts with label Earth Work. Show all posts

1.1.12

Neighborhood Park in Arabian Ranches , Dubai , UAE


Arabian Ranches, Package 18D, District 7C, Neighborhood Park, Nc1
(Earth Work (cut , fill , back fill ), Boundary Walls , steel works , swimming pool , kids playing area , chain link fence , aluminum works ,all  paving , paints , asphalt works , etc) from A to Z.

Consultant: Parson International Limited
 
Client: Emmar

 2007/09 to 2008/11

As “construction project coordinator” I was responsible for: 
Organizing the project.
Hire and Follow up sub-contract agreements & variations
Manage construction and post-construction co-ordination issues between related parties of the projects
Prepare contract program& budget estimates.
Resource allocation (To formulate long term labour/plant resource)
Represent Company in the meetings, contracts and purchase negotiations

Identify critical activities of site. / ensure effective and optimum use of available resources.

Also spot check the work done by sub-contractors. Follow up material submittals.

As “Planning Engineer”: 
Create & update programs with complete logic, resource loading, monitoring the progress of the work (also specifications and budget), preparing any recovery schedule if needed to achieve the targets and milestones and communicate with client representative & consultant to ensure contract requirements are being met.

Support operation on site through the efficient utilization of available resources, directing & guiding people to ensure that work is progressing according to schedule and that quality is maintained.

Read & interpret drawings.

Bypass Pipe Network, Dubai, UAE

2007/09 to 2008/11, Bypass Pipe Network, from Greens Wastewater Treatment Plant to IRR2 Lake, Emirates living development, design & build. Dubai, UAE. 
Client: EMAAR, 
Consultant: Parson International Limited.
My responsibility: As “construction project coordinator- Planning Engineer”, I was responsible for: organizing the project. Manage construction, Prepare contract program, Represent Company in meetings.

Rough Grading Works In Downtown Jebel Ali Zone 2&3. Dubai, UAE

  
2007/05 to 2007/09, Rough Grading Works In Downtown Jebel Ali Zone 2&3. Dubai, UAE. 
My responsibility: “Construction Planning Manager”, Plan, evaluates, Prepare and submit construction project program. Monitoring the progress of the work, Control preparation of progress reports (Daily, Weekly, Monthly).


Persian Gulf International Airport , Bushehr, Assaluyeh port , Iran.

Control Tower of Persian Gulf Airport During Construction
Control Tower of Persian Gulf Airport During Testing and Commissioning 
 
     April 2004 to May 2007, Persian Gulf International Airport. Bushehr, Assaluyeh port, Iran.
Client:  Pars Special Economic Energy Zone (PSEEZ),
(ImenRah Consulting Engineers is a leading design consultant in the field of airport design; they also have road and architectural design departments and deliver landmark projects in over 30 cities around Iran.)
My responsibility: As Assistant Project Director:
  • Directly assisting and supporting the Project Manager.
  • Coordinating between design and construction teams.
  • Coordinating of all members of the design team to ensure the delivered design is fully coordinated.
Assists Project Manager in :
  • Coordination with Program Controls (Cost/Schedule), including cost and schedule status.
  • Troubleshooting specific construction related issues.
  • Direction and control of the Consultant's site supervision team as per contract requirements.
  • Coordinating field office drawing controls, progress photos and documents needed to support construction progress meetings and reports.
Completing tasks related to the planning, design, tendering and construction of airport facilities under the direction of Project Managers.
Participate in the Development of Airport Master Plans.
Co-ordination of all members of the Design office to ensure the delivered design is fully coordinated.
In charge for all civil work in Airfield (Including: RWY, Taxiways, Drainage trenches, etc).
In charge of civil work for internal access roads and parking (cut & fill, Sub-Base, Asphalt).
Review and appraisal of reports prepared by Design office and Sub-Consultants.
Coordination and interface with the Main contractors, Client and Airport Authority.
Attend weekly meeting with all project parties.
Monitor work progress and determine performance vs projected targets of work.
Prepare delay notices and submit, Perform Delay analysis and Prepare Extension of Time Programmes. Review of claims and variations.
Monitor subcontractors’ performance, review and approve their programmes and ensure that they deliver respective work on schedule.

View of RWY ,Taxiway& Apron from Control Tower 

Internal access roads and parking 


to See My Other airport Projects / experiences click Here

30.12.11

Kish Nobonyad And Mirmohana, Civil Earth work (35 km main & access roads),– kish island, Iran

·       2006/08 to 2007/04, Kish Nobonyad And Mirmohana, Civil Earth work (35 km main & access roads), Iran – kish island, Client: Kish Municipality, (Part Time).
My responsibility: “Assistant Project Manager & Design coordinator”.
as Assistant Project Director : co-ordination of all members of the design team to ensure the delivered design is fully coordinated. Chairing weekly progress meeting with client and contractor, coordinate  Consultant's site supervision team as per contract requirements, co-ordination with the Client for progressive payments, review of claims and variations, evaluating progress,