Profession: Civil Engineer
Education: Doctor of Philosophy: Civil Engineering. Project Management Essentials for Construction (University of Toronto)
Specialization: Project Management, Construction Coordination, Road & Airport Design and execution , QA/QC.
Position in Firm: Project Manager-Design, Contract Administrator, Road & Airport Design Engineer, Project Civil Engineer , Infrastructure Engineer, Resident Engineer, Civil Senior Inspector, Project Manager-Construction, Construction Manager, Project coordinator
Showing posts with label Permitting. Show all posts
Showing posts with label Permitting. Show all posts

5.1.14

New Medical Center for Abu Dhabi National Oil Company (ADNOC), Abu Dhabi, UAE.



June 2013 to Present
New Medical Center for  Abu Dhabi National Oil Company  (ADNOC), Abu Dhabi, UAE.
(New Medical Centre - Day Care Clinical Facility, B + G + 2 floors , GFA approx = 21000 sqm)
Client : Abu Dhabi National Oil Company  (ADNOC)

 Responsibilities:
 Providing design for the preliminary and detail design phases of the project for Master-plan, infrastructure.
 (Including : Road Design ,Storm water , Sewer system ,  etc)
 Preparing drawings in accordance with our client and internationally recognized standard formats.
 Preparing design drawings using AutoCAD.
 Supervise/Review outsourced design of services.
 Follow up obtaining related NOCs & Design approvals from Authorities.

30.11.13

Multifunctional Arena, Zayed sport city, Abu Dhabi, UAE.


 
 

November 2012 to December 2013

Multifunctional Arena (FGB), Zayed sport city, Abu Dhabi, UAE.
(for up to 3500 spectators including training facilities, G + 2 floors , GFA approx = 14000 sqm)
Owner: Crown Prince Court Emirates of Abu Dhabi
Client representative: Reem investment
Contractor: Max Boegl Emirates Building Contracting LLC

Responsibilities:
Providing design for the preliminary and detail design phases of the project for Master-plan, infrastructure, and service connections to Multifunctional Arena in Zayed Sport City Abu Dhabi.
(Including : Storm water , Sewer system , Road Design , Landscape , etc)
Preparing drawings in accordance with our client and internationally recognized standard formats.
Preparing design drawings using AutoCAD.
Supervise/Review outsourced design of services.
Follow up obtaining related NOCs & Design approvals from Authorities.
 
 


1.1.12

GLOBALFOUNDRIES FAB 9.1 , Abu Dhabi , UAE


May 2011 to Dec 2011   GLOBALFOUNDRIES FAB 9.1 , Semiconductor  Manufacturing , Abu Dhabi , UAE, 
Client : GLOBALFOUNDRIES & ATIC (Advanced Technology Investment Company LLC), 

Design & Built Contractor :M+WGroup ( a $6bn plant) 

My responsibility: As Civil Engineer, and member of AOR (Architect of Record) team, was to assist the Liaison Manager to coordinate the design team and follow up related design approvals from Authorities having jurisdiction.

- Liaison with the local authorities for permitting purpose and obtaining required water, power, sewerage and other services required for operation of plant as well as construction period.

- Check compliant of design with local codes, standards and specifications.