Profession: Civil Engineer
Education: Doctor of Philosophy: Civil Engineering. Project Management Essentials for Construction (University of Toronto)
Specialization: Project Management, Construction Coordination, Road & Airport Design and execution , QA/QC.
Position in Firm: Project Manager-Design, Contract Administrator, Road & Airport Design Engineer, Project Civil Engineer , Infrastructure Engineer, Resident Engineer, Civil Senior Inspector, Project Manager-Construction, Construction Manager, Project coordinator
Showing posts with label Landscape. Show all posts
Showing posts with label Landscape. Show all posts

30.11.13

Multifunctional Arena, Zayed sport city, Abu Dhabi, UAE.


 
 

November 2012 to December 2013

Multifunctional Arena (FGB), Zayed sport city, Abu Dhabi, UAE.
(for up to 3500 spectators including training facilities, G + 2 floors , GFA approx = 14000 sqm)
Owner: Crown Prince Court Emirates of Abu Dhabi
Client representative: Reem investment
Contractor: Max Boegl Emirates Building Contracting LLC

Responsibilities:
Providing design for the preliminary and detail design phases of the project for Master-plan, infrastructure, and service connections to Multifunctional Arena in Zayed Sport City Abu Dhabi.
(Including : Storm water , Sewer system , Road Design , Landscape , etc)
Preparing drawings in accordance with our client and internationally recognized standard formats.
Preparing design drawings using AutoCAD.
Supervise/Review outsourced design of services.
Follow up obtaining related NOCs & Design approvals from Authorities.
 
 


1.1.12

Al Maryah Island Infrastructure and Landscape , Abu Dhabi , UAE



Dec 2011 to 2012  Sowwah ( Al Maryah )Island Infrastructure and Landscape , Abu Dhabi , UAE,

Client :Mubadala Development Company PJSC

Contractor : Al Naboodah Construction

My responsibility: As Senior Civil - Infrastructure Engineer

  • Review and approve Material and Method Statements offered by Contractor.
  • Site supervision, reporting to Client representative, attending Weekly progress meetings.
  • Preparing monthly report.


 
Utility Tunnel

Laying Gas pipe

Neighborhood Park in Arabian Ranches , Dubai , UAE


Arabian Ranches, Package 18D, District 7C, Neighborhood Park, Nc1
(Earth Work (cut , fill , back fill ), Boundary Walls , steel works , swimming pool , kids playing area , chain link fence , aluminum works ,all  paving , paints , asphalt works , etc) from A to Z.

Consultant: Parson International Limited
 
Client: Emmar

 2007/09 to 2008/11

As “construction project coordinator” I was responsible for: 
Organizing the project.
Hire and Follow up sub-contract agreements & variations
Manage construction and post-construction co-ordination issues between related parties of the projects
Prepare contract program& budget estimates.
Resource allocation (To formulate long term labour/plant resource)
Represent Company in the meetings, contracts and purchase negotiations

Identify critical activities of site. / ensure effective and optimum use of available resources.

Also spot check the work done by sub-contractors. Follow up material submittals.

As “Planning Engineer”: 
Create & update programs with complete logic, resource loading, monitoring the progress of the work (also specifications and budget), preparing any recovery schedule if needed to achieve the targets and milestones and communicate with client representative & consultant to ensure contract requirements are being met.

Support operation on site through the efficient utilization of available resources, directing & guiding people to ensure that work is progressing according to schedule and that quality is maintained.

Read & interpret drawings.