May 2011 to Dec 2011 GLOBALFOUNDRIES FAB 9.1 , Semiconductor Manufacturing , Abu Dhabi , UAE,
Client : GLOBALFOUNDRIES & ATIC (Advanced Technology Investment Company LLC),
Design & Built Contractor :M+WGroup ( a $6bn plant)
My responsibility: As Civil Engineer, and member of AOR (Architect of Record) team, was to assist the Liaison Manager to coordinate the design team and follow up related design approvals from Authorities having jurisdiction.
- Liaison with the local authorities for permitting purpose and obtaining required water, power, sewerage and other services required for operation of plant as well as construction period.
- Check compliant of design with local codes, standards and specifications.
Design & Built Contractor :M+WGroup ( a $6bn plant)
My responsibility: As Civil Engineer, and member of AOR (Architect of Record) team, was to assist the Liaison Manager to coordinate the design team and follow up related design approvals from Authorities having jurisdiction.
- Liaison with the local authorities for permitting purpose and obtaining required water, power, sewerage and other services required for operation of plant as well as construction period.
- Check compliant of design with local codes, standards and specifications.