· Nov 2008 to Dec 2011 , Paris-Sorbonne University Abu Dhabi, UAE.
Project Value: $326m ,
Client: Mubadala Development Company,
Project Management: Parsons, Contractor: Al Habtoor - Murray and Roberts Joint Venture.
This 1-million-ft² campus is the first overseas campus of the one of the world’s oldest content value universities in UAE, Relocating to a purpose-built campus on Al Reem Island that will accommodate 2,000 students. University was completed 1 month ahead of schedule and on budget.
My responsibility: As Assistant Project Director of Obermeyer (Project’s Technical Consultant) from beginning to end of Defect Liability period to assist the senior project director to:
- Direction and control, organization, and coordination of all consulting activities of the project team (sub-consultants and engineers) together with senior project director.
- Site visits for inspections; issue Non Conformance Reports (NCR).
- Coordinate field office drawing controls, progress photos and documents needed to support construction progress meetings and reports.
- Chair weekly QA/QC meeting.
- Fully in charge during the Defect Liability Period.
Project Value: $326m ,
Client: Mubadala Development Company,
Project Management: Parsons, Contractor: Al Habtoor - Murray and Roberts Joint Venture.
This 1-million-ft² campus is the first overseas campus of the one of the world’s oldest content value universities in UAE, Relocating to a purpose-built campus on Al Reem Island that will accommodate 2,000 students. University was completed 1 month ahead of schedule and on budget.
My responsibility: As Assistant Project Director of Obermeyer (Project’s Technical Consultant) from beginning to end of Defect Liability period to assist the senior project director to:
- Direction and control, organization, and coordination of all consulting activities of the project team (sub-consultants and engineers) together with senior project director.
- Site visits for inspections; issue Non Conformance Reports (NCR).
- Coordinate field office drawing controls, progress photos and documents needed to support construction progress meetings and reports.
- Chair weekly QA/QC meeting.
- Fully in charge during the Defect Liability Period.
Male & Female Resident Buildings
|