Profession: Civil Engineer
Education: Doctor of Philosophy: Civil Engineering. Project Management Essentials for Construction (University of Toronto)
Specialization: Project Management, Construction Coordination, Road & Airport Design and execution , QA/QC.
Position in Firm: Project Manager-Design, Contract Administrator, Road & Airport Design Engineer, Project Civil Engineer , Infrastructure Engineer, Resident Engineer, Civil Senior Inspector, Project Manager-Construction, Construction Manager, Project coordinator

1.1.12

Al Maryah Island Infrastructure and Landscape , Abu Dhabi , UAE



Dec 2011 to 2012  Sowwah ( Al Maryah )Island Infrastructure and Landscape , Abu Dhabi , UAE,

Client :Mubadala Development Company PJSC

Contractor : Al Naboodah Construction

My responsibility: As Senior Civil - Infrastructure Engineer

  • Review and approve Material and Method Statements offered by Contractor.
  • Site supervision, reporting to Client representative, attending Weekly progress meetings.
  • Preparing monthly report.


 
Utility Tunnel

Laying Gas pipe

GLOBALFOUNDRIES FAB 9.1 , Abu Dhabi , UAE


May 2011 to Dec 2011   GLOBALFOUNDRIES FAB 9.1 , Semiconductor  Manufacturing , Abu Dhabi , UAE, 
Client : GLOBALFOUNDRIES & ATIC (Advanced Technology Investment Company LLC), 

Design & Built Contractor :M+WGroup ( a $6bn plant) 

My responsibility: As Civil Engineer, and member of AOR (Architect of Record) team, was to assist the Liaison Manager to coordinate the design team and follow up related design approvals from Authorities having jurisdiction.

- Liaison with the local authorities for permitting purpose and obtaining required water, power, sewerage and other services required for operation of plant as well as construction period.

- Check compliant of design with local codes, standards and specifications. 

Special Security Hospital, Abu Dhabi, UAE.



Special Security Hospital, Abu Dhabi, UAE. 
(125 bed secure hospital, B + G + 3 floors, 7 buildings.)
Client: SEHA, Abu Dhabi Health Services Company

Responsibilities:
Providing design for the preliminary and detail design phases of the project for Pavement, Geometric Design, Traffic flow, road marking, Road Signs.
Preparing drawings in accordance with our client and internationally recognized standard formats.
Providing design of hospital heliport. Preparing design drawings using AutoCAD.
Prepare project specification. Supervise/Review outsourced design of roads.
Follow up obtaining related NOCs & Design approvals from Authorities
.


Paris-Sorbonne University Abu Dhabi, UAE



·       Nov 2008 to Dec 2011 , Paris-Sorbonne University Abu Dhabi, UAE.
Project Value: $326m ,
Client: Mubadala Development Company,
Project Management: Parsons, Contractor: Al Habtoor - Murray and Roberts Joint Venture.

This 1-million-ft² campus is the first overseas campus of the one of the world’s oldest content value universities in UAE, Relocating to a purpose-built campus on Al Reem Island that will accommodate 2,000 students. University was completed 1 month ahead of schedule and on budget.

My responsibility: As Assistant Project Director of Obermeyer (Project’s Technical Consultant) f
rom beginning to end of Defect Liability period to assist the senior project director to:

-   Direction and control, organization, and coordination of all consulting activities of the project team (sub-consultants and engineers) together with senior project director.
-   Site visits for inspections; issue Non Conformance Reports (NCR).
-   Coordinate field office drawing controls, progress photos and documents needed to support construction progress meetings and reports.
-   Chair weekly QA/QC meeting.
-   Fully in charge during the Defect Liability Period.

Male & Female Resident Buildings

Neighborhood Park in Arabian Ranches , Dubai , UAE


Arabian Ranches, Package 18D, District 7C, Neighborhood Park, Nc1
(Earth Work (cut , fill , back fill ), Boundary Walls , steel works , swimming pool , kids playing area , chain link fence , aluminum works ,all  paving , paints , asphalt works , etc) from A to Z.

Consultant: Parson International Limited
 
Client: Emmar

 2007/09 to 2008/11

As “construction project coordinator” I was responsible for: 
Organizing the project.
Hire and Follow up sub-contract agreements & variations
Manage construction and post-construction co-ordination issues between related parties of the projects
Prepare contract program& budget estimates.
Resource allocation (To formulate long term labour/plant resource)
Represent Company in the meetings, contracts and purchase negotiations

Identify critical activities of site. / ensure effective and optimum use of available resources.

Also spot check the work done by sub-contractors. Follow up material submittals.

As “Planning Engineer”
Create & update programs with complete logic, resource loading, monitoring the progress of the work (also specifications and budget), preparing any recovery schedule if needed to achieve the targets and milestones and communicate with client representative & consultant to ensure contract requirements are being met.

Support operation on site through the efficient utilization of available resources, directing & guiding people to ensure that work is progressing according to schedule and that quality is maintained.

Read & interpret drawings.

Bypass Pipe Network, Dubai, UAE

2007/09 to 2008/11, Bypass Pipe Network, from Greens Wastewater Treatment Plant to IRR2 Lake, Emirates living development, design & build. Dubai, UAE. 
Client: EMAAR, 
Consultant: Parson International Limited.
My responsibility: As “construction project coordinator- Planning Engineer”, I was responsible for: organizing the project. Manage construction, Prepare contract program, Represent Company in meetings.

Rough Grading Works In Downtown Jebel Ali Zone 2&3. Dubai, UAE

  
2007/05 to 2007/09, Rough Grading Works In Downtown Jebel Ali Zone 2&3. Dubai, UAE. 
My responsibility: “Construction Planning Manager”, Plan, evaluates, Prepare and submit construction project program. Monitoring the progress of the work, Control preparation of progress reports (Daily, Weekly, Monthly).


Municipality Street improvement, Tehran, Iran


Municipality Street improvement, Tehran, Iran. April 2004 to May 2007.

Set up my own business with family members in construction and contracting field completing several small size projects in Earth Work, Paving and curbing, Car-Parks, Access Roads, Construction of Bus Stops, Roads, and Road Widening.

Client: Tehran Municipality

My responsibility as Construction Manager: Manage the project from tender to completion (Budget, time, resource, quality, invoices).
·      Direction and control all managers and engineers on the project to assure the project proceeds according to schedule (target program).
·      Management and coordination of all departments (commercial, planning, Q.C., Safety, MEP, etc).
·      Representing company in meetings & contracts negotiations,
·      Subcontract selection.
·      Recruitment of required staff.

Darabad Multi story Residential Apartment Buildings, Tehran , Iran

April 2004 to May 2007, Construction of Multi story Residential Buildings,  
Client: “Taavonimaskan Khalabanan Shekari Co.” (Developer Company)


G+4 floors, steel structure from Turnkey contract from foundation to completion and handing over to end users.
(set up my own business with family members in construction and contracting field)

My responsibility as Construction Manager included:


  • Managed a 60-person crew.
  • Organizing the project, management of construction.
  • Managing the project from A to Z (Budget, time, resource, quality, invoices) 
  • Preparation of the contract program.
  • Representing the company in meetings, contract negotiations and subcontract selections.
  • Direction and control all engineers on the project to assure the project proceeds according to schedule (target program).
  • Recruit required staffs. 
  • Managing and coordination of all departments (commercial, planning, Q.C., Safety, MEP, etc).
  • Contract preparation, co-ordinate and negotiate about claims and variations with client & consultants.
  • Overall control on purchases of required materials, purchase or hiring machineries.
  • Control the reports before submission to consultant and client.
  • Prepare project reports for Company board of direction. 
  • Attend in internal company meetings and report to the Board of Direction.



Persian Gulf International Airport , Bushehr, Assaluyeh port , Iran.

Control Tower of Persian Gulf Airport During Construction
Control Tower of Persian Gulf Airport During Testing and Commissioning 
 
     April 2004 to May 2007, Persian Gulf International Airport. Bushehr, Assaluyeh port, Iran.
Client:  Pars Special Economic Energy Zone (PSEEZ),
(ImenRah Consulting Engineers is a leading design consultant in the field of airport design; they also have road and architectural design departments and deliver landmark projects in over 30 cities around Iran.)
My responsibility: As Assistant Project Director:
  • Directly assisting and supporting the Project Manager.
  • Coordinating between design and construction teams.
  • Coordinating of all members of the design team to ensure the delivered design is fully coordinated.
Assists Project Manager in :
  • Coordination with Program Controls (Cost/Schedule), including cost and schedule status.
  • Troubleshooting specific construction related issues.
  • Direction and control of the Consultant's site supervision team as per contract requirements.
  • Coordinating field office drawing controls, progress photos and documents needed to support construction progress meetings and reports.
Completing tasks related to the planning, design, tendering and construction of airport facilities under the direction of Project Managers.
Participate in the Development of Airport Master Plans.
Co-ordination of all members of the Design office to ensure the delivered design is fully coordinated.
In charge for all civil work in Airfield (Including: RWY, Taxiways, Drainage trenches, etc).
In charge of civil work for internal access roads and parking (cut & fill, Sub-Base, Asphalt).
Review and appraisal of reports prepared by Design office and Sub-Consultants.
Coordination and interface with the Main contractors, Client and Airport Authority.
Attend weekly meeting with all project parties.
Monitor work progress and determine performance vs projected targets of work.
Prepare delay notices and submit, Perform Delay analysis and Prepare Extension of Time Programmes. Review of claims and variations.
Monitor subcontractors’ performance, review and approve their programmes and ensure that they deliver respective work on schedule.

View of RWY ,Taxiway& Apron from Control Tower 

Internal access roads and parking 